Preparing for riveting
1h
January 28, 2025
The short session today, preparing sides and bulkheads for riveting.
Just a few things. First, I drilled the center section vertical bars F-704G to the bulkhead and countersunk them.
Then I drilled all the holes to the final size (#30), deburred the parts, and re-assembled them with the alignment pins. The next step is to rivet the sides.

