November 2025
October 2025
- 10-24 3h Installing aftermarket aileron bellcranks

- 10-19 4h Continuing with the left wing

- 10-18 4h Started on the left wing bottom skins

- 10-15 2h Finished riveting the bottom skins

- 10-13 2h Short riveting session

- 10-12 4h Continuing riveting the bottom skin

- 10-11 3h Riveting the bottom skins

- 10-10 3h Priming the bottom skins

- 10-05 3h Hanging the flaps

- 10-04 2h Deburring the skins

- 10-02 2h Finishing wiring the right wing

September 2025
- 09-28 1h Wiring the right wing

- 09-27 3h Supporting the wires

- 09-26 3h Rebuilding the Archer antenna

- 09-24 2h Installing the Archer antenna

- 09-20 3h Assembling small pushrods

- 09-19 1.5h Working on aileron pushrods

- 09-17 1h Creating brackets to hold the wires

- 09-16 3h Riveting aileron fairings and flap braces

- 09-15 1.5h Priming aileron fairing and flap braces

- 09-14 1h Installing left position/strobe lights

- 09-13 4h Installing left wing avionics

- 09-07 20h Pressing flanges in the ribs

August 2025
- 08-31 2h Cutting a hole for the pitot mast

- 08-25 2h Attached the right fuel tank

- 08-24 6h Finished riveting the top skins and made a wing cradle

- 08-17 3h Riveting the top skins

- 08-15 4h Riveting the top skins

- 08-10 3h Preparing the top skins

- 08-09 2h Testing the fuel tank

- 08-04 2h Sealing the cover

- 08-03 4h Riveting the rear baffle

- 08-02 4h The inboard rib and the z-brackets

June 2025
May 2025
April 2025
March 2025
February 2025
January 2025
December 2024
- 12-31 1h Working on the fuel sender plate

- 12-26 2.5h The inboard rib and the fuel sender

- 12-25 3h The outboard rib

- 12-24 2.5h The fifth rib and a vent line

- 12-23 2.5h The fourth rib

- 12-21 2.5h The third rib

- 12-15 2.5h Riveting the second rib

- 12-14 4h Riveting the first rib

- 12-08 6h Riveting stiffeners to the fuel tank skin

- 12-07 4h Various small tasks in preparation of the fuel tank assembly

- 12-01 2h Drilling the fuel tank skins

November 2024
September 2024
- 09-20 1h Finishing the right aileron

- 09-19 4h Riveting the right aileron

- 09-18 5h Riveting the left aileron

- 09-17 2h Priming the aileron ribs and the spar

- 09-16 3h Drilling the counterbalance pipes

- 09-15 4h Priming more ribs and drilling the aileron spars

- 09-14 2h Riveting the aileron stiffeners

- 09-13 1.5h Priming the aileron skins

- 09-08 1.5h Priming the aileron stiffeners

- 09-07 3h Deburring the aileron stiffeners

- 09-02 2.5h Priming the second set of wing ribs