Deburring the skins.
2h
January 26, 2025
Continue reading →
Riveting the leading edge to the main spar.
2h
January 20, 2025
Continue reading →
Countersinking the main spar.
2h
January 19, 2025
Continue reading →
Working on the fuel sender plate.
1h
January 12, 2025
Continue reading →
Installing the rear baffle.
3h
January 5, 2025
Continue reading →
Working on the fuel sender plate.
1h
December 31, 2024
Continue reading →
The inboard rib and the fuel sender.
2.5h
December 26, 2024
Continue reading →
The outboard rib.
3h
December 25, 2024
Continue reading →
The fifth rib and a vent line.
2.5h
December 24, 2024
Continue reading →
The fourth rib.
2.5h
December 23, 2024
Continue reading →
The third rib.
2.5h
December 21, 2024
Continue reading →
Riveting the second rib.
2.5h
December 15, 2024
Continue reading →
Riveting the first rib.
4h
December 14, 2024
Continue reading →
Riveting stiffeners to the fuel tank skin.
6h
December 8, 2024
Continue reading →
Various small tasks in preparation of the fuel tank assembly.
4h
December 7, 2024
Continue reading →
Drilling the fuel tank skins.
2h
December 1, 2024
Continue reading →
Riveting the leading edge.
4h
November 29, 2024
Continue reading →
Priming the leading edge parts.
4h
November 28, 2024
Continue reading →
Started working on the fuel tank.
2h
November 24, 2024
Continue reading →
Preparing for the leading edge lights.
2h
November 23, 2024
Continue reading →
Continuing work on the right wing.
4h
November 17, 2024
Continue reading →
Riveting the main ribs to the rear spar.
4h
October 16, 2024
Continue reading →
Riveting the main ribs.
5h
October 13, 2024
Continue reading →
Finishing the right aileron.
1h
September 20, 2024
Continue reading →
Riveting the right aileron
4h
September 19, 2024
Continue reading →
Riveting the left aileron
5h
September 18, 2024
Continue reading →
Priming the aileron ribs and the spar
2h
September 17, 2024
Continue reading →
Drilling the counterbalance pipes
3h
September 16, 2024
Continue reading →
Priming more ribs and drilling the aileron spars
4h
September 15, 2024
Continue reading →
Riveting the aileron stiffeners
2h
September 14, 2024
Continue reading →
Priming the aileron skins
1.5h
September 13, 2024
Continue reading →
Priming the aileron stiffeners
1.5h
September 8, 2024
Continue reading →
Deburring the aileron stiffeners
3h
September 7, 2024
Continue reading →
Priming the second set of wing ribs
2.5h
September 2, 2024
Continue reading →
Priming the first set of wing ribs
3h
August 25, 2024
Continue reading →
Deburring the main ribs
4h
August 24, 2024
Continue reading →
Constructing a wing stand
4h
August 18, 2024
Continue reading →
Continuing deburring the ribs
1h
August 7, 2024
Continue reading →
Processing the wing ribs
4h
July 9, 2024
Continue reading →
Riveting the flaps
6h
April 25, 2024
Continue reading →
Priming the flaps parts
3h
April 24, 2024
Continue reading →
Fabricating vent lines
4h
April 19, 2024
Continue reading →
Continuing working on the flaps
4h
April 17, 2024
Continue reading →
Started working on flaps
5h
April 16, 2024
Continue reading →
Various smaller tasks
3h
April 12, 2024
Continue reading →
Continuing working on fairings
3h
April 5, 2024
Continue reading →
Finishing the rudder bottom fairing
3h
March 31, 2024
Continue reading →
Finished riveting the rear spars
1h
March 25, 2024
Continue reading →
Assembling the aileron hinges and priming the spars
2h
March 24, 2024
Continue reading →
Priming the doublers and the aileron brackets
3h
March 22, 2024
Continue reading →
Preparing the rear spar assembly
3h
March 21, 2024
Continue reading →
Fabricating the tiedown assemblies
4h
March 2, 2024
Continue reading →
Finishing the countersinks on the wing spars
4h
February 29, 2024
Continue reading →
Starting work on the wings
2h
February 27, 2024
Continue reading →
Finishing the baggage bulkheads
2h
February 24, 2024
Continue reading →
Finishing the access panels
2h
February 21, 2024
Continue reading →
Finishing the vertical fairings
2h
January 6, 2024
Continue reading →
Unexpected crack in the rudder fairing
2h
September 26, 2023
Continue reading →
Finishing the top fairings
2h
September 24, 2023
Continue reading →
Repairing the vertical stabilizer fairing
3h
September 21, 2023
Continue reading →
Back to the fairings!
4h
September 20, 2023
Continue reading →
Soldering FlyLeds landing lights and the controller
3h
September 19, 2023
Continue reading →
Assembling FlyLeds landing lights and the controller
3h
September 18, 2023
Continue reading →
Vertical stabilizer fairing
1.5h
September 17, 2023
Continue reading →
Fitting the bottom rudder fairing
1.5h
September 16, 2023
Continue reading →
Closing the stabilizer end caps
1h
September 15, 2023
Continue reading →
Horizontal stabilizer fairings
2h
September 13, 2023
Continue reading →
Closing the tips of elevators fairings
2h
September 11, 2023
Continue reading →
Fabricating the rudder stops
3h
September 10, 2023
Continue reading →
Preparing the fairings
3h
September 8, 2023
Continue reading →
Started working on elevator fairings
2h
September 5, 2023
Continue reading →
Installing trim tab pin
0.5h
September 4, 2023
Continue reading →
Bolting some of the control system
3h
September 2, 2023
Continue reading →
Working on elevator control stops
2h
September 1, 2023
Continue reading →
Finished mounting the vertical stabilizer
3h
August 28, 2023
Continue reading →
Started mounting the vertical stabilizer
4h
August 27, 2023
Continue reading →
Finished mounting the horizontal stabilizer
4h
August 26, 2023
Continue reading →
Started mounting the horizontal stabilizer
3h
August 25, 2023
Continue reading →
Finishing the service bulletin SB-00036
5h
August 24, 2023
Continue reading →
Priming various parts
1.5h
August 23, 2023
Continue reading →
Service bulletin SB-00036 REV 3
1.5h
August 22, 2023
Continue reading →
Inventorying laser cut parts
0.5h
August 21, 2023
Continue reading →
Finished riveting aft skins
2h
August 20, 2023
Continue reading →
Installing the nutplates
1.5h
August 19, 2023
Continue reading →
Baggage bulkhead panels
1.5h
August 17, 2023
Continue reading →
Working on the OP-60 ADAHRS bracket
1.5h
August 16, 2023
Continue reading →
Working on the OP-43 access panels
2h
August 15, 2023
Continue reading →
Riveting the aft fuselage skins
1h
August 13, 2023
Continue reading →
Fabricating central tunnel cover
1h
July 30, 2023
Continue reading →
Priming aft skins
2h
July 29, 2023
Continue reading →
Installing Click Bond mounts
1h
July 25, 2023
Continue reading →
Worked on the flaps actuator
3h
July 23, 2023
Continue reading →
Installed the flaps actuator
4h
July 22, 2023
Continue reading →
Riveted the right baggage floor
3h
July 21, 2023
Continue reading →
Riveted the gussets and the left baggage floor
3h
July 20, 2023
Continue reading →
Priming the baggage floors
1h
July 19, 2023
Continue reading →
Riveting the floors and the gussets
3h
July 17, 2023
Continue reading →
A bit of priming work
2h
July 16, 2023
Continue reading →
Drilling the top aft skins
2h
July 13, 2023
Continue reading →
Riveting the external steps
2.5h
July 9, 2023
Continue reading →
Drilling the J-stiffeners and the ribs
2.5h
July 9, 2023
Continue reading →
Fitting the aft top skins
5h
July 1, 2023
Continue reading →
Riveting the canopy decks, F-709 bulkhead and the shoulder harness anchors
2h
June 30, 2023
Continue reading →
Riveting the aft deck and the rudder brace
2h
June 29, 2023
Continue reading →
Priming the canopy decks and the aft deck
1.5h
June 28, 2023
Continue reading →
The bellcrank channel and the remaining gusset
2.5h
June 27, 2023
Continue reading →
Drilling various gussets
2.5h
June 26, 2023
Continue reading →
Rudder brace, spacers, and fuselage gussets
4h
June 25, 2023
Continue reading →
Rolled over the canoe
1.5h
June 24, 2023
Continue reading →
Fabricating spacers for the step tubes
1.5h
June 23, 2023
Continue reading →
Riveting the right baggage bulkheads
1.5h
June 22, 2023
Continue reading →
Few more parts are primed
2.5h
June 21, 2023
Continue reading →
Fuselage almost riveted
8h
June 18, 2023
Continue reading →
A bit more riveting
2h
May 7, 2023
Continue reading →
Riveted the aft of the longeron
1h
May 2, 2023
Continue reading →
Sealing the firewall
3h
April 29, 2023
Continue reading →
Three little tasks
3h
April 22, 2023
Continue reading →
Assemling the fuselage
4h
April 17, 2023
Continue reading →
Installing the left skin
6h
April 16, 2023
Continue reading →
New right longeron
2.5h
April 12, 2023
Continue reading →
Countersinking the F-704-H side plates
1.5h
April 11, 2023
Continue reading →
Riveted F-704 to the central section
4h
April 8, 2023
Continue reading →
Primed some parts
2h
April 7, 2023
Continue reading →
Assorted work
3h
April 5, 2023
Continue reading →
Countersinking the longerons
3h
April 4, 2023
Continue reading →
Countersinking and deburring
2h
April 2, 2023
Continue reading →
The cowling hinges
3h
April 1, 2023
Continue reading →
The reinforcement angles
3h
March 25, 2023
Continue reading →
The left F-7101 and countersinks
2h
March 23, 2023
Continue reading →
The right F-7101 and drilling the floor
3h
March 21, 2023
Continue reading →
The left external step and the floor stiffeners
1.5h
March 19, 2023
Continue reading →
Fitting the rudder pedals block
2h
March 8, 2023
Continue reading →
Fabricating the rudder pedals bearings
4h
March 7, 2023
Continue reading →
Drilling the floor stiffeners
3h
March 4, 2023
Continue reading →
Drilling the lower longeron
1h
March 3, 2023
Continue reading →
Baggage area framing
2.5h
March 2, 2023
Continue reading →
Ruining some parts
1.5h
March 1, 2023
Continue reading →
Fitting the left F-684 gusset
2h
February 28, 2023
Continue reading →
Fitting the right F-684 gusset
2h
February 27, 2023
Continue reading →
Drilling the bolt holes in the lower longerons
2h
February 26, 2023
Continue reading →
Finishing fitting the stiffeners
4h
February 25, 2023
Continue reading →
Fitting the right auxiliary longeron
3h
February 24, 2023
Continue reading →
Fitting the left auxiliary longeron
2.5h
February 23, 2023
Continue reading →
Fitting the firewall
3h
February 22, 2023
Continue reading →
Fabricating the F-904-L straps
1h
February 20, 2023
Continue reading →
Drilled the left step to the skin
1.5h
February 18, 2023
Continue reading →
Finishing the right step
4h
February 17, 2023
Continue reading →
Fitting the right external step
2.5h
February 16, 2023
Continue reading →
Continued drilling the fuselage
1.5h
February 15, 2023
Continue reading →
Drilling the longerons
3h
February 14, 2023
Continue reading →
Fitting the other skin
2h
February 13, 2023
Continue reading →
Longerons and the side skin
3h
February 12, 2023
Continue reading →
Joining the fuselage
4h
February 11, 2023
Continue reading →
Installing the aileron trim and the crotch strap brackets
2h
February 1, 2023
Continue reading →
Priming the brackets
1h
January 31, 2023
Continue reading →
Working on an aileron trim
3h
January 29, 2023
Continue reading →
Finished riveting the aft section
2h
January 28, 2023
Continue reading →
Storing parts on the shelf
2h
January 26, 2023
Continue reading →
Splitting the case
3h
January 25, 2023
Continue reading →
Removed the pistons and the connecting rods
4h
January 24, 2023
Continue reading →
Removed valve train and cylinder #1
2h
January 23, 2023
Continue reading →
Dropped the sump on the engine
2h
January 22, 2023
Continue reading →
Few more F-711 rivets
2h
January 21, 2023
Continue reading →
Parting out the engine
3h
January 20, 2023
Continue reading →
Few more aft fuselage rivets
1h
January 19, 2023
Continue reading →
Engine core!
1h
January 17, 2023
Continue reading →
Riveting the remaining fuselage aft rivets
2h
January 16, 2023
Continue reading →
Fitting the tail spring mount
4h
January 15, 2023
Continue reading →
Preparing for the fuselage join
2h
January 14, 2023
Continue reading →
Drilling the new seat ribs
4h
January 13, 2023
Continue reading →
Removing the crotch strap brackets
3h
January 12, 2023
Continue reading →
Just a minor item
0.5h
January 7, 2023
Continue reading →
Some setbacks
1h
January 6, 2023
Continue reading →
Drilling the ribs and the tailspring
4h
January 5, 2023
Continue reading →
Finishing the longerons, continuing the center section
3h
January 4, 2023
Continue reading →
Bending the longerons
5h
January 3, 2023
Continue reading →
Riveting the ribs and fitting the control column
4h
January 1, 2023
Continue reading →
Priming the parts of the center section
3h
December 31, 2022
Continue reading →
Making spacers for F-704
3h
December 30, 2022
Continue reading →
Riveted F-704
1.5h
December 28, 2022
Continue reading →
Fitting the tailwheel spring mount
3h
December 27, 2022
Continue reading →
Fabricating the web stiffeners
3h
December 26, 2022
Continue reading →
Preparing for riveting
1h
December 25, 2022
Continue reading →
Wing alignment pins
2h
December 24, 2022
Continue reading →
Optional lightening and cover ribs
4h
December 23, 2022
Continue reading →
Started working on F-704 bulkhead
5h
December 22, 2022
Continue reading →
Finishing the wing kit inventory
1h
December 20, 2022
Continue reading →
Wing kit inventory
1h
December 19, 2022
Continue reading →
Initial flaps work
1h
November 11, 2022
Continue reading →
Riveting the seat backs and pushrods
3h
November 9, 2022
Continue reading →
Priming the seat backs and pushrods
4h
November 8, 2022
Continue reading →
Seat backs
9h
November 5, 2022
Continue reading →
Seat back brace
2h
November 4, 2022
Continue reading →
Seat floors
3h
November 3, 2022
Continue reading →
Finished riveting the center section
2h
November 1, 2022
Continue reading →
Riveting the center section
2.5h
October 30, 2022
Continue reading →
Repairing some flanges
2h
October 25, 2022
Continue reading →
Riveting ribs to the bulkhead
4h
October 24, 2022
Continue reading →
Installing the nutplates and dimpling the skin
2h
October 23, 2022
Continue reading →
Priming the center section ribs
6h
October 22, 2022
Continue reading →
Fitting new ribs and priming the skin
3h
October 20, 2022
Continue reading →
More deburring
1.5h
October 19, 2022
Continue reading →
Deburring the center section parts
2h
October 18, 2022
Continue reading →
Fluting the F-715 seat ribs and disassembly
2h
October 16, 2022
Continue reading →
Drilling the center section and F-623 ribs
5h
October 15, 2022
Continue reading →
Drilling the crotch strap brackets and clecoed the center section
3h
October 12, 2022
Continue reading →
Fluting the seat ribs
3h
October 11, 2022
Continue reading →
Working on seat ribs
3h
October 10, 2022
Continue reading →
Modifying the seat ribs
0.5h
October 9, 2022
Continue reading →
Finished riveting aft fuselage
2h
October 8, 2022
Continue reading →
Cutting the holes for the tailwheel mount
1h
October 7, 2022
Continue reading →
More of the aft fuselage riveting
1h
October 6, 2022
Continue reading →
Continuing riveting the aft fuselage
1h
October 5, 2022
Continue reading →
Dimpling and beginning of an aft fuselage riveting
4h
October 4, 2022
Continue reading →
Priming J-stiffeners
3h
October 3, 2022
Continue reading →
Minor things
1h
October 2, 2022
Continue reading →
Primed the aft fuselage skins
3h
October 1, 2022
Continue reading →
Finished deburring aft fuselage parts
1.5h
September 30, 2022
Continue reading →
Started deburring aft fuselage parts
2h
September 29, 2022
Continue reading →
Drilling the aft fuselage and rudder cable fairings
3h
September 28, 2022
Continue reading →
More tiny tasks
1h
September 26, 2022
Continue reading →
Various small tasks
3h
September 25, 2022
Continue reading →
Drilling the J-channels
4h
September 24, 2022
Continue reading →
Priming the F-711 parts
1h
September 22, 2022
Continue reading →
Fabricating F-711B
3h
September 21, 2022
Continue reading →
Modifying the forming block
1h
September 17, 2022
Continue reading →
Forming block for the F-711B
3h
September 16, 2022
Continue reading →
Fitting the F-711 bulkhead
2h
September 14, 2022
Continue reading →
Starting the aft fuselage assembly
2h
September 13, 2022
Continue reading →
Riveting the F706 bulkhead
4h
September 12, 2022
Continue reading →
Priming the F706 parts
3h
September 11, 2022
Continue reading →
Deburring the bulkheads
3h
September 9, 2022
Continue reading →
F-706 bulkhead parts
2h
September 8, 2022
Continue reading →
Wiring holes in F-706, F-707, F-708
2h
September 7, 2022
Continue reading →
F711 and F712 bulkheads
2h
September 6, 2022
Continue reading →
Various aft bulkheads
2h
September 5, 2022
Continue reading →
F-710B angle
1h
September 4, 2022
Continue reading →
Riveting F705 together
6h
September 3, 2022
Continue reading →
Priming the F705 bulkhead parts
2h
September 2, 2022
Continue reading →
Riveting firewall together
4h
September 1, 2022
Continue reading →
Priming the firewall parts
2h
August 31, 2022
Continue reading →
Seat stop plate
1h
August 29, 2022
Continue reading →
Dimpling and counter-sinking firewall parts
4h
August 27, 2022
Continue reading →
Making a new firewall angle
1.5h
August 25, 2022
Continue reading →
Drilling the remaining F-705 bulkhead parts
3h
August 23, 2022
Continue reading →
More work on the F-705 bulkhead
4h
August 22, 2022
Continue reading →
F-705 bulkhead
3h
August 19, 2022
Continue reading →
Drilling firewall components
5h
August 18, 2022
Continue reading →
Firewall bulkhead
4h
August 17, 2022
Continue reading →
Fuselage inventory
8h
August 16, 2022
Continue reading →
Rolling the left elevator leading edge
3h
July 31, 2022
Continue reading →
Riveting the left elevator
6h
July 23, 2022
Continue reading →
Painting the replacement parts
3h
July 22, 2022
Continue reading →
Fitting the top rudder fairing and rolling the leading edge
5h
July 16, 2022
Continue reading →
Rolling the right elevator leading edge
3h
July 13, 2022
Continue reading →
Drilling the trim tab
4h
July 12, 2022
Continue reading →
Various small tasks
3h
July 11, 2022
Continue reading →
Priming the trim tab skin and rebuilding the bearing assembly
4h
July 10, 2022
Continue reading →
Bending the close-out elevator tabs
2h
July 9, 2022
Continue reading →
Deburring the left elevator parts
2.5h
July 7, 2022
Continue reading →
Preparing the left elevator
2h
July 6, 2022
Continue reading →
Attaching the skin to the understructure
3h
July 4, 2022
Continue reading →
Riveting the right elevator
3h
June 28, 2022
Continue reading →
Priming the right elevator understructure parts
2.5h
June 27, 2022
Continue reading →
Folding the trailing edge
3h
June 25, 2022
Continue reading →
Riveting the stiffeners to the skins
1.5h
June 24, 2022
Continue reading →
Mounting the trim servo
1h
June 23, 2022
Continue reading →
Trimming the counterbalance
1h
June 22, 2022
Continue reading →
Riveting the stiffeners to the skins
3h
June 20, 2022
Continue reading →
Priming the elevator skin parts
4h
June 19, 2022
Continue reading →
Drilling the right elevator understructure
4h
June 18, 2022
Continue reading →
Riveting the trailing edge
3h
June 17, 2022
Continue reading →
Glueing the trailing edge
4h
June 15, 2022
Continue reading →
The elevators skins and the skeleton
4h
June 14, 2022
Continue reading →
Riveting the rudder skin
5h
June 13, 2022
Continue reading →
Creating a trailing edge angle
3h
June 11, 2022
Continue reading →
Dimpling the remaining parts and riveting the rudder
3h
June 8, 2022
Continue reading →
Countersinking the rudder wedge and priming
3h
June 7, 2022
Continue reading →
Continuing the rudder build
3h
June 6, 2022
Continue reading →
Cutting elevator stiffeners
1h
June 5, 2022
Continue reading →
Fitting rudder together
2h
June 4, 2022
Continue reading →
Riveting the stiffeners and assembling the skeleton
5h
June 3, 2022
Continue reading →
Priming the skins and the stiffeners
2h
June 2, 2022
Continue reading →
Working on stiffeners
2h
May 25, 2022
Continue reading →
Finishing the vertical stabilizer
4h
May 24, 2022
Continue reading →
Preparing the front spar assembly
4h
May 23, 2022
Continue reading →
Riveting the horizontal stabilizer
10h
May 21, 2022
Continue reading →
Priming the ribs and preparing the front spar
4h
May 20, 2022
Continue reading →
Assembling the rear spar
2h
May 19, 2022
Continue reading →
Priming the skins and the spars
5h
May 17, 2022
Continue reading →
Cleaning the parts
2h
May 16, 2022
Continue reading →
Deburring the horizontal stabilizer parts
4h
May 14, 2022
Continue reading →
Finishing the horizontal stabilizer skeleton
6h
May 13, 2022
Continue reading →
Assembling the horizontal stabilizer skeleton
4h
May 12, 2022
Continue reading →
Drilling the horizontal stabilizer
6h
May 11, 2022
Continue reading →
Riveting the vertical stabilizer
5h
May 10, 2022
Continue reading →
Priming the vertical stabilizer
2.5h
May 9, 2022
Continue reading →
Building a paint booth
2h
May 8, 2022
Continue reading →
Deburring vertical stabilizer parts
4h
May 5, 2022
Continue reading →
Drilling the vertical stabilizer
3h
May 4, 2022
Continue reading →
Empennage inventory
3h
May 3, 2022
Continue reading →
Unriveting apart
1h
April 18, 2022
Continue reading →
Riveting together
2h
March 17, 2022
Continue reading →
Backriveting stiffeners and riveting skeleton
2h
March 16, 2022
Continue reading →
Deburring, dimpling and countersinking
1.5h
March 15, 2022
Continue reading →
Drilling and assembling with clecos
1h
March 14, 2022
Continue reading →
Stiffeners, deburring
1h
March 13, 2022
Continue reading →
Lessons from the first practice kit
March 10, 2022
Continue reading →