March 2024
January 2024
September 2023
- 09-26 2h Unexpected crack in the rudder fairing

- 09-24 2h Finishing the top fairings

- 09-21 3h Repairing the vertical stabilizer fairing

- 09-20 4h Back to the fairings!

- 09-17 1.5h Vertical stabilizer fairing

- 09-16 1.5h Fitting the bottom rudder fairing

- 09-15 1h Closing the stabilizer end caps

- 09-13 2h Horizontal stabilizer fairings

- 09-11 2h Closing the tips of elevators fairings

- 09-08 3h Preparing the fairings

- 09-05 2h Started working on elevator fairings

- 09-04 30m Installing trim tab pin

July 2022
- 07-31 3h Rolling the left elevator leading edge

- 07-23 6h Riveting the left elevator

- 07-22 3h Painting the replacement parts

- 07-16 5h Fitting the top rudder fairing and rolling the leading edge

- 07-13 3h Rolling the right elevator leading edge

- 07-12 4h Drilling the trim tab

- 07-11 3h Various small tasks

- 07-10 4h Priming the trim tab skin and rebuilding the bearing assembly

- 07-09 2h Bending the close-out elevator tabs

- 07-07 2.5h Deburring the left elevator parts

- 07-06 2h Preparing the left elevator

- 07-04 3h Attaching the skin to the understructure

June 2022
- 06-28 3h Riveting the right elevator

- 06-27 2.5h Priming the right elevator understructure parts

- 06-25 3h Folding the trailing edge

- 06-24 1.5h Riveting the stiffeners to the skins

- 06-23 1h Mounting the trim servo

- 06-22 1h Trimming the counterbalance

- 06-20 3h Riveting the stiffeners to the skins

- 06-19 4h Priming the elevator skin parts

- 06-18 4h Drilling the right elevator understructure

- 06-17 3h Riveting the trailing edge

- 06-15 4h Glueing the trailing edge

- 06-14 4h The elevators skins and the skeleton

- 06-13 5h Riveting the rudder skin

- 06-11 3h Creating a trailing edge angle

- 06-08 3h Dimpling the remaining parts and riveting the rudder

- 06-07 3h Countersinking the rudder wedge and priming

- 06-06 3h Continuing the rudder build

- 06-05 1h Cutting elevator stiffeners

- 06-04 2h Fitting rudder together

- 06-03 5h Riveting the stiffeners and assembling the skeleton

- 06-02 2h Priming the skins and the stiffeners

May 2022
- 05-25 2h Working on stiffeners

- 05-24 4h Finishing the vertical stabilizer

- 05-23 4h Preparing the front spar assembly

- 05-21 10h Riveting the horizontal stabilizer

- 05-20 4h Priming the ribs and preparing the front spar

- 05-19 2h Assembling the rear spar

- 05-17 5h Priming the skins and the spars

- 05-16 2h Cleaning the parts

- 05-14 4h Deburring the horizontal stabilizer parts

- 05-13 6h Finishing the horizontal stabilizer skeleton

- 05-12 4h Assembling the horizontal stabilizer skeleton

- 05-11 6h Drilling the horizontal stabilizer

- 05-10 5h Riveting the vertical stabilizer

- 05-09 2.5h Priming the vertical stabilizer

- 05-05 4h Deburring vertical stabilizer parts

- 05-04 3h Drilling the vertical stabilizer

- 05-03 3h Empennage inventory




