Ivan's RV-7
January 2023
01-31
1h
Priming the brackets
01-26
2h
Storing parts on the shelf
01-25
3h
Splitting the case
01-24
4h
Removed the pistons and the connecting rods
01-23
2h
Removed valve train and cylinder #1
01-22
2h
Dropped the sump on the engine
01-20
3h
Parting out the engine
01-17
1h
Engine core!
Home
Blog
Map
Contact
Most recent
Wiring tool
August 13, 2026
More switches wiring
August 9, 2026
Wiring the switches
August 7, 2026
Continuing work on the panel
August 5, 2026
Working on the panel inserts
August 4, 2026
Categories
Empennage (66 posts,
207.5h
)
Fuselage (204 posts,
547.5h
)
Wings (110 posts,
314h
)
Practice Kit (7 posts,
8.5h
)
Side Projects (2 posts,
5h
)
Engine (8 posts,
18h
)
Avionics (3 posts,
12h
)
Highlights
Workbenches
Rivets
EkoPoxy Calculator