Ivan's RV-7
January 2023
01-31
1h
Priming the brackets
01-26
2h
Storing parts on the shelf
01-25
3h
Splitting the case
01-24
4h
Removed the pistons and the connecting rods
01-23
2h
Removed valve train and cylinder #1
01-22
2h
Dropped the sump on the engine
01-20
3h
Parting out the engine
01-17
1h
Engine core!
Home
Blog
Map
Contact
Most recent
Working on the panel inserts
August 4, 2026
Redoing the fuse panel
July 26, 2026
Continuing wiring the power distribution
June 28, 2026
Wiring the power distribution
May 3, 2026
Battery retainers
April 22, 2026
Categories
Empennage (66 posts,
207.5h
)
Fuselage (201 posts,
533.5h
)
Wings (110 posts,
314h
)
Practice Kit (7 posts,
8.5h
)
Side Projects (2 posts,
5h
)
Engine (8 posts,
18h
)
Avionics (3 posts,
12h
)
Highlights
Workbenches
Rivets
EkoPoxy Calculator