Ivan's RV-7
January 2023
01-31
1h
Priming the brackets
01-26
2h
Storing parts on the shelf
01-25
3h
Splitting the case
01-24
4h
Removed the pistons and the connecting rods
01-23
2h
Removed valve train and cylinder #1
01-22
2h
Dropped the sump on the engine
01-20
3h
Parting out the engine
01-17
1h
Engine core!
Home
Blog
Map
Contact
Most recent
Installing OAT sensor
March 14, 2026
Attaching Skybolt attachment brackets
March 12, 2026
Drilling holes for brake reservoir
March 11, 2026
Trimming carbon fiber panel
March 5, 2026
Assembling forward tunnel cover
February 15, 2026
Categories
Empennage (66 posts,
207.5h
)
Fuselage (187 posts,
493h
)
Wings (110 posts,
314h
)
Practice Kit (7 posts,
8.5h
)
Side Projects (2 posts,
5h
)
Engine (8 posts,
18h
)
Avionics (3 posts,
12h
)
Highlights
Workbenches
Rivets
EkoPoxy Calculator