A bit more riveting
2h
March 24, 2025
Life is getting in a way a bit, so progress is slow. A few more lines of rivets are set.
The second spanwise line of the rivets of the F-704 bulkhead is set.
Plus, some lines of rivets on the front side skins.
Still, took me about 2 hours. Mostly, because all the side rivets I was doing by myself, and it takes about three times longer.

