Rolling the left elevator leading edge
3h
January 28, 2025
Today I finished the left elevator by rolling the leading edge.
Not much to report here, I used the same process with the pipe, J-bolts, and the Gorilla tape.
With that, all the empennage parts are complete (except for the fiberglass fairings)!

