Ivan's RV-7

Rolling the left elevator leading edgeTimer icon3h

July 31, 2022

Today I finished the left elevator by rolling the leading edge.

Not much to report here, I used the same process with the pipe, J-bolts, and the Gorilla tape.

The leading edge rolled.

With that, all the empennage parts are complete (except for the fiberglass fairings)!

All the empennage parts (sans fairings).